KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  3-31-2008
Number of Hours:  2.25
Manual Reference:  8-13
Brief Description:  Fabricated the elevator push tube tunnel cover

I back tracked in the assembly process today as I had not yet fabricated the elevator push tube tunnel cover. It involved fabricating from Z channel stock and aliminium sheet the F-741A and F-741B and fitting them to the cabin floor.
' style=

F-741A/B elevator push tube tunnel cover fabricated

F-741A/B elevator push tube tunnel cover fabricated

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.